This gallery contains 11 photos.
If it looks bad, it more than likely is dangerous. Here are some examples of work that we have had to rectify recently.
When you have to migrate a site from one URL to a new domain name, the following SQL commands will help you out. These can be run from the CLI or PHPMyadmin as a standard SQL statement. UPDATE wp_options SET … Continue reading
I worked on a failed Windows 7 hard disk for a client recently where there was no backup available. Major issue was the fact that the home directory was encrypted with a third party product. I mounted the encrypted drive … Continue reading
A new client has a requirement for using handheld wireless devices (2.4Ghz) over a very large area. Approx 700m wide x 950m long. One of the major obstacles is the lack of power, so we have had to design and … Continue reading
Just whipped together a quick config to get a new Mikrotik HAP Lite AP connected to Telstra with ether 2,3,4,5 set to be a LAN bridge. This was using a Telstra Ultimate 4G USB dongle. /interface bridge add auto-mac=yes name=bridge-local … Continue reading
Over the past few weeks all the existing website hosting infrastructure has been moved to new hardware on to a 1Gbps connection. The new hardware and software has state of the art security and firewall protection to help combat the … Continue reading
Some days are just beautiful in winter. Here we are adding additional radio links to an existing solar powered radio site. All equipment is in the 5Ghz ISM band.
This gallery contains 11 photos.
If it looks bad, it more than likely is dangerous. Here are some examples of work that we have had to rectify recently.
Critical systems require redundancy. This remote repeater site is a totally self sufficient system that handles wireless networking, UHF and VHF transceivers that are critical to the clients operations. In the event of multiple network failures to buildings or fibre … Continue reading
This gallery contains 3 photos.
The client required a redundant high speed link to their DR site that is 800m away from their main building. Due to obstacles, we erected a 9m climbable mast to the building roof and installed a 24Ghz Airfiber link and … Continue reading
Well, the first ever Tasmanian Mikrotik training course has been completed with a 100% certification pass rate. The 11 students that chose to sit the exams on Friday are now certified. The feedback from the course was fantastic, everybody was … Continue reading